Quick Contact

Simply complete the form and we'll come back to you.

  1. Your Name(*)
    Please let us know your name.
  2. Your Email(*)
    Please let us know your email address.
  3. Contact Number
    Invalid Input
  4. Suburb
    Invalid Input
  5. State or Territory
    Invalid Input
  6. Service Type




    Invalid Input
  7. Notes(*)
    Please let us know your message.
  8. Human Check(*)
    Invalid Input

swanbankRecycled Water Management Plan.

Following Chris's involvement as WEA for the Swan Bank Power Station WEMP, Taylor Environmental were able to assist CS Energy with the preparation of the WEMP report, implementation of the WEMP and various projects contained within the WEMP. As the power station was to receive recycled water from the recently upgraded Bundamba Advance Wastewater Treatment Plant, a Recycled Water Management Plan (RWMP) was required. Taylor Environmental prepared a RWMP which identified and managed any risks associated with using recycled water in the power station operations (cooling tower make up water). The RWMP allowed the power station to ultimately substitute 20 ML/ day of mains supply water with recycled water.